Project title: Kharg Island Gas Gathering and NGL Recovery (24” Shore Pulling) Location: kharg island, Persian Gulf Client: Valentine Maritime (Kish) L.L.C. Job summary
Shore pulling preparation & assisting operations including preparation of site and installation of Equipment & assisting during shore pulling operation & Trenching that included Constructing a Berm from Land Fall point to 0 LAT for Excavation access and grounding from Land Fall Point to water level 0 LAT which was approx. 70 meter Long
|